EZ-ELEKTROSYSTÉMY Košice s.r.o. Teplárenská 5, 040 12 Košice

U.S. Steel Košice

Dynamo line No.4

Regulation and Measurement boiler K7

Chromium passivation EC2

Modernization of ML1

Regulating the bulk density of coal

Measurement of the amount of electric. energy - DZ Energetics

Boiler K6 - Modification of the 6 kV substation r61

TVa - LED Lighting

New coal stock No.3

De-dusting of Steelwork  I, II

De-dusting of Blast Furnace no. 1

Revamping and modernization of switch rooms

T10/20, T40, T60, T63, T613/21, T615

Vacuuming of steel

Sintering lines VKB 1, VKB 2 a VKB 3

EC line no. 2

Continuous casting I, II

RAM VP 1, 2, 3

Cold and hot roll mill

Heating station

Zinc coated line no. 3 – assembly of electric parts

Switch room reconstruction  and modernizationT63

Dedusting of Steel plant 1

Reconstruction of Steel plant 1

Dedusting of Blast furnace 1; Cast house; Switch room T10/20

Dedusting smelt-houses Division unit Steel plant I. phase

Coiler no.3

Change of damaged engine and electric installation on Blast furnace 1

Oxygen equipment no..9 – Oxygen plant

Longitudinal division line no.15, 16

Path for crane wagon Steel plant 2

Pressure of Chemistry – Division unit (DZ) Koksovňa

Emission free filling of chambers of High-capacity Coke battery 1 and 3

Dry dedusting of gases of High-capacity Coke battery 1 and 3

Boiler 3 reconstruction

Cold Rolling mill – Repair 6kV feed from distribution point T613/21 for TR10

Cold Rolling mill – Increasing station for water pressure

Repair of electric parts on Coal scooper no.2 Division Unit – Blast furnaces

Cable change and trays repair near SO VP no. 2

Dose with oil to Blast furnace 1

Switch room reconstruction T40, T 45, T 70

Repair after accident and fire on Blast furnace 2

Expansion of bell furnace of annealing oven

Regulation and Measurement 4-bench Tandem, U.S.Steel Košice

Regulation and Measurement Electro tinning line 1

Regulation and Measurement Turbo generator 3V

Regulation and Measurement sintering straps

Regulation and Measurement chambers of switch room T.60

Regulation and Measurement water system TVA

Dosing of dust lime on Rudisko 1

New dynamo line no.3

Reconstruction and modernization 5-bench Tandem

Electro tinning line 2

Continual annealing line no.2

2-bench Tandem

Vacuuming of steel in the Steel mill 1

Bus distribution USSK

Modernization of Electro tinning line 1

Buffer furnace no.1